- Plan the plastering when the surface receiving plaster coat is sufficiently matured.
- Ensure that subsequent building operations do not cause any damage in plaster work.
- Start external plastering from the top most floors and proceed downwards.
- Start internal plastering after the structural work is complete.
- Do plastering on ceiling wherever required before the walls are plastered.